SecondSourceThe Second Source on AI

← All verdict cards · Verify this card's timestamp ↗

On interconnect, copper (DSP and… — resolves 2027-06-30

Pending

On interconnect, copper (DSP and… — resolves 2027-06-30

Branch call · Asserted on Jul 14, 2026

The call

On interconnect, copper (DSP and retimers) wins near-term and optics (CPO) is deferred. Gelsinger's fast-pivot-to-optics narrative is kept on record as a standing contradiction.

Sources

MimiVsJames(訂閱制分析師,Wei-Chih 私有源)
「⽬前最⼤量出貨仍為50G per lane的AEC,但預期2026年下半年開始,市場將加速轉向100…」

More Than Moore (Ian Cutress)
「I joke that NVL72 is an engineering marvel and a m…」

The receipt

Reviewed in H1 2027: if Rubin-generation scale-up is still mainly copper and DSP, the call stands. Any hyperscaler deploying CPO at scale, beyond pilots, and it fails.

Resolves

Jun 30, 2027

Outcome

Not due yet — no public outcome to report.

What we learned

Not resolved yet — here is the condition we pre-committed to that would overturn this call (check it yourself, you don't have to wait):

A CPO system yield breakthrough, on the order of 99.5% per engine, together with volume deployment at any major buyer, would void the near-term copper call.

On interconnect, copper (DSP and… — resolves 2027-06-30